> infra_planner_

Let's configure your deployment in a few steps

1
2
3

Basic Configuration

Enter the total number of servers for your deployment (new build or refresh)

Typical sizes:

Not sure which to pick?

LLM Training, Large AI: GPU 8x H200 NVL or HGX

AI/ML Inference: GPU 4x H200 NVL

3D Rendering, Video: GPU 2x RTX 6000

Web/App servers: General Purpose Local Intel

VMs (VMware/Hyper-V): Hypervisor

Kubernetes/Docker: Container Worker

SQL/PostgreSQL/MySQL: Database Local Intel

Oracle: Oracle DB (optimizes licensing costs)

Analytics/BI: DataWarehouse

60%
40% 50% 60% 75%

You pay 40% of list price

Infrastructure Planning Calculator

Plan your server refresh, budget, and timeline with precision

Current Configuration

General Purpose 25G Network 10kW Rack Limit 60% Discount

Deployment Scale

Network Topology

Server Configuration

Rack Configuration

⚠️ This is often the primary constraint

Network Configuration

Switch Models:
ToR: N9K-C93180YC-FX3 (48x25G + 6x100G)
Spine: N9K-C9364D-GX2A (64x400G, 2U)
Spine count auto-calculated from ToR uplinks

Optics Configuration

VAST EBox Storage

VAST EBox Servers:0
VAST Racks:0
Total Usable Capacity:0 TB

VAST handles data protection internally - no replication factor needed

Pricing & Discount

60%
40% 50% 60% 75%

Enterprise discounts typically range from 40-75% off list price.

Pricing Mode
Enterprise Deal (60% off)

Adjust slider to see pricing at different discount levels

Refresh Rate Options

Validation Status

How We Calculate These Estimates

Rack Count

Racks = ⌈Servers ÷ Servers per Rack⌉

Servers per rack limited by power budget and rack units

Switch Count

ToR Switches = 2 per rack (redundant pair)

Spine switches based on oversubscription ratio

Power Calculation

Total Power = (Servers × Server W) + (Switches × Switch W)

Facility power = Total × PUE

Pricing

List prices from Cisco CCW (Feb 2026)

Your discount is applied to all components

Timeline

Duration = Servers ÷ Deployment Rate

Run Rate vs Rack & Roll comparison available

Workload Presets

Based on typical Cisco UCS configurations

Power, cost, and specs from CCW validated BOMs